Kia Cars

Kia Cars Waiting Period Feb 2023 – Carens, Seltos, Sonet, Carnival

In India in February 2023, the waiting time for a Kia car like the Seltos is up to 28 weeks, while the waiting time for a Sonet is 11-12 weeks.
Kia’s continued success in the Indian market can be attributed to the high demand for and quality of the brand’s stylish and well-equipped offerings. The new Carnival may come in Korea soon, and the updated Seltos will be released there soon after. There can be a 12-week delay for the Carens. This being said, if you’re in the market for a new vehicle in India, you’ll want to take a look at the current Kia waiting time.

Kia Seltos Waiting Period

There are three different engine sizes available for the Kia Seltos: 1.5L NA Petrol, 1.4L Turbo Petrol, and 1.5L Diesel. There are both manual and automatic transmission options for each of these engines. Depending on which engine choice you select, there may be a delay of up to 28 weeks for certain Seltos models.

Kia Cars
Kia Cars
Engine Option Transmission Option Waiting Period
1.5L Smartstream NA petrol MTAT 05-10 Weeks09-10 Weeks
1.4L Smartstream turbo Petrol MTAT 05-10 Weeks09-10 Weeks
1.5L CRDi Diesel Engine MTAT 09-28 Weeks27-28 Weeks

A few of the variants like the HTE 1.5L P MT, HTK 1.5L P MT, HTK Plus 1.5L P MT, HTX 1.5L P MT, GTX(O) 1.4L P MT, and GTX Plus 1.4L P MT. The diesel variants and automatic versions however on the other hand have a significantly higher waiting period.

Kia Sonet Waiting Period

Like the Seltos, the Sonet is available with a turbocharged gasoline engine, a normally aspirated gasoline engine, and a diesel engine, making it a formidable competitor to vehicles like the Maruti Brezza, Hyundai Venue, Tata Nexon, and others in the subcompact SUV segment.

Engine Option Transmission Option Waiting Period
1.2L Smartstream NA petrol MT 07-08 Weeks
1.0L Smartstream Turbo Petrol iMTAT 07-08 Weeks11-12 Weeks
1.5L CRDi Diesel Engine MTAT 11-12 Weeks11-12 Weeks

Any one of these motors, meanwhile, can be paired with either a manual or an automatic transmission. There may be a wait of up to 12 weeks for the Sonet, depending on the configuration you select.

Read More:

Author

Leave a Comment

Your email address will not be published. Required fields are marked *